Permits and Authorizations
Sea bed survey
Pre Lay Grapnel Run
Shore End
Beach Works
maintenance
Environmental Impact Study
Supply Vessel
  Las Toninas is a place with shallow waters and a separate shore end is recommended.

Following is a list of the duties realized for the operation and that we recommend for the installation.

Cable transfer in Mar del Plata or Buenos Aires
The cable is transferred from the main vessel or a charter to the supply vessel for the separate shore end Cable Lay
Beach Works / Spilt Pipes / Grounding anodes
Pos lay burial using a MOV or ROV